Review the site
Confirm the load, shaft, door openings and interfaces with the building.
FEIYA helps project teams define elevator requirements for heavy loads, unusual dimensions and complex sites, from early drawings through handover.
Discuss your project ↗
Drawing on elevator manufacturing experience since 1978, FEIYA coordinates its commercial, design, installation and maintenance teams. On-site work and after-sales responsibilities are agreed for each project.
Confirm the load, shaft, door openings and interfaces with the building.
Agree drawings, production milestones, site readiness and installation responsibilities.
Confirm handover documents, service contacts and maintenance responsibilities.
See how FEIYA has configured and delivered elevators for industrial and building projects in China.

A 12,000 kg freight elevator serving 12 floors at a rated speed of 0.5 m/s. See the site and equipment details in the project case study.
Read the project case study ↗
A passenger elevator for an office building, with accessible controls and an in-car display for floor and operating information.
Read the project case study ↗
An elevator added to an existing residential building to improve daily access while adapting to the existing structure.
Read the project case study ↗FEIYA reviews custom freight elevator configurations from 1 to 25 tonnes. Load, duty cycle, door opening, car size and shaft conditions guide the design. Passenger elevators can also be configured for the building.
View freight elevator options ↗
Confirm the component list, technical documents, spare-parts requirements and maintenance responsibilities during specification, so the project team knows what support is available at handover.
FEIYA has served elevator customers in Central Asia, Southeast Asia, Africa and the South Pacific. Documentation, delivery and local installation responsibilities are agreed with the project team.
Discuss elevator requirements, delivery documentation and local installation responsibilities for your project.
Discuss an overseas project ↗Discuss elevator requirements, delivery documentation and local installation responsibilities for your project.
Discuss an overseas project ↗Discuss elevator requirements, delivery documentation and local installation responsibilities for your project.
Discuss an overseas project ↗Discuss elevator requirements, delivery documentation and local installation responsibilities for your project.
Discuss an overseas project ↗Share the required load, shaft drawings, site location and delivery requirements so FEIYA can review them with your team.
Discuss your project ↗