FEIYA / MAJOR PROJECTS

Elevator projects built around the site

FEIYA helps project teams define elevator requirements for heavy loads, unusual dimensions and complex sites, from early drawings through handover.

Discuss your project
Industrial building with several floors and long rows of windows
Industrial project site / China
01 / PROJECT DELIVERY

One team across the project

Drawing on elevator manufacturing experience since 1978, FEIYA coordinates its commercial, design, installation and maintenance teams. On-site work and after-sales responsibilities are agreed for each project.

01

Review the site

Confirm the load, shaft, door openings and interfaces with the building.

02

Coordinate delivery

Agree drawings, production milestones, site readiness and installation responsibilities.

03

Plan for operation

Confirm handover documents, service contacts and maintenance responsibilities.

DOMESTIC PROJECTS

Elevator projects in China

See how FEIYA has configured and delivered elevators for industrial and building projects in China.

02 / FREIGHT ENGINEERING

Configured around the load and the building

1–25 t

FEIYA reviews custom freight elevator configurations from 1 to 25 tonnes. Load, duty cycle, door opening, car size and shaft conditions guide the design. Passenger elevators can also be configured for the building.

View freight elevator options
Stainless steel freight elevator cabin with wide doors and a diamond-plate floor
Industrial freight elevator cabin
03 / COMPONENTS & SERVICE

Plan for maintenance from the start

Confirm the component list, technical documents, spare-parts requirements and maintenance responsibilities during specification, so the project team knows what support is available at handover.

04 / OVERSEAS PROJECTS

Project support across regions

FEIYA has served elevator customers in Central Asia, Southeast Asia, Africa and the South Pacific. Documentation, delivery and local installation responsibilities are agreed with the project team.

FEIYA / PROJECT SUPPORT

Planning a complex elevator project?

Share the required load, shaft drawings, site location and delivery requirements so FEIYA can review them with your team.

Discuss your project