Picture the enquiry on the supplier’s desk: a capacity, three floor levels and a plan of the shaft. There is no pallet size and no indication of how the goods arrive at the door. Before pricing the job, someone will have to ask for those details. Who receives the load upstairs? Where do the empty carriers go afterwards?

Those questions give a freight elevator for a warehouse a more useful starting point than “three floors, five tonnes”. Weight and floors matter, but they leave the supplier guessing about much of the job.

The worksheet below, prepared by FEIYA Elevator, is intended for that early exchange. There is space for what you know and a place to record the questions. You do not need to fill the gaps with estimates disguised as measurements.

A page for the load

Use one page for each distinct handling task. The heaviest pallet might be compact, while another product is light but awkwardly long. Trying to describe both with a single “maximum load” entry can conceal the space requirement.

Start with these entries:

  • Goods or container: ___.
  • Complete outside dimensions, including packaging and overhang: ___.
  • Goods weight and the source of that figure: ___.
  • Pallet, trolley or carrier weight, if separate: ___.
  • Other equipment that enters with the goods: ___.
  • Any additional applicable travelling load: ___.

Write down what the figures include. Suppose a packing sheet says “gross weight”. Does that figure already include the carrier? Adding a separate carrier weight without checking could count it twice. Keep the packing-sheet reference with the entry so that a colleague can trace the answer.

Then ask the elevator supplier to show how the stated load fits in the proposed cabin. Request usable cabin dimensions and clear entrance dimensions as separate items. The opening in the building is a third item and should not be substituted for either of them.

A page for the handling equipment

“We use pallet trucks” is a start, but add the model, its dimensions and the information available on its own weight and wheels. Beside the model, write what happens to it after loading: it stays in the cabin, or someone removes it before travel.

For a forklift, obtain the actual working weight. A description such as “3-ton forklift” may refer to lifting capacity rather than the mass of the vehicle. Send the data sheet and identify the fitted configuration. For axle or wheel-load information, record the source as well as the figure. If the equipment supplier has not provided the relevant data, add it to the enquiry’s outstanding-information list. An equal division of total weight by wheel count is not a substitute for that data.

For forklift work, write a sentence about the doorway. “Truck places the pallet and withdraws from the cabin” describes a different review from “truck remains on the landing”. The first involves truck loads at the entrance and inside during loading, even though the truck does not travel. A third possibility, carrying the truck upstairs, must be stated just as clearly.

One more entry belongs here: the proposed arrangement for anyone accompanying the goods. Have the permitted arrangement confirmed for the selected lift type and destination. The word “freight” or “goods” in a catalogue does not answer that question.

A plan for each landing

A shaft rectangle on its own tells the supplier little about access. Extend the sketch far enough to include the nearby racks, columns and walls, then mark the approach and exit. Label the position of waiting goods. Upstairs, identify where the receiving equipment starts before the doors open.

For each sheet, keep three small notes in a corner: date, drawing revision and measurement status. “Preliminary layout, dimensions to be surveyed” is an honest description of an early sketch. It also prevents that sketch being mistaken for a checked installation drawing.

A useful question beside the doorway is: can the loaded equipment make this approach? Straight-line width alone cannot describe a turn around a column. The vehicle’s turning information and your actual floor plan need to be considered together by the project team.

Look upstairs too. Mark a second load waiting at the receiving floor in your planning discussion. Does it occupy the exit route for the load arriving in the cabin? This is a layout question worth resolving before racks and waiting positions are fixed. Agree where waiting goods belong without treating a passage or emergency route as spare storage.

Put a proposed second entrance on a separate plan option if it appears to help the route. That option needs review against the building and equipment arrangement. There is no reason to assume it is necessary at every floor or that it will suit every warehouse.

A short record of the busiest period

A daily total is not enough to describe a dispatch deadline. Use a small table showing the period that matters to your operation. The following is a blank collection sheet, not a promised duty or a FEIYA project result.

EntryWhat to record
PeriodStart and finish of the interval being assessed
RouteOrigin and receiving floor for each movement
QuantityNumber of loads, with the source of the count
Proposed batchLoads per trip, subject to approval of the arrangement
Shared useOther departments needing the elevator during that interval

For an operating site, ask the operations team which period is representative and collect the record then. Record preparation, loading and receiving as well as travel. Include empty returns. Where the building is new, use an estimate and write “forecast” above the table.

Consider an illustrative batch of 12 pallets. The arithmetic gives 12 loaded trips for one pallet at a time, or six for an approved two-pallet arrangement. Now add the unanswered questions beside that count: loading time, receiving time, returns, door operation and other calls. Until these are considered, neither trip count establishes an hourly handling rate.

If an offer mentions a handling rate, ask to see the assumptions behind it. Take that explanation back to the warehouse team. For instance, does it assume the next pallet is already waiting, or that receiving equipment is always available? Those assumptions may be more useful to discuss than a speed figure in isolation.

A drawing register for the building

Collect the available shaft plan, floor levels, openings and access information. In the covering note, identify whether the shaft exists. For an existing shaft, include the available survey and identify what still requires checking; a preliminary sketch is not confirmation of the site dimensions.

The supplier’s equipment layout is the other half of this file. Put its requirements for structural interfaces, machine space, pit, overhead and power alongside the building information for review by the responsible professionals. Leave a visible record of any mismatch and who is following it up. Generic diagrams found online cannot settle those details for your building.

A simple drawing register helps here: file name, revision, date and the person responsible for checking it. When an opening moves or a floor level changes, update the register and tell the parties working from the old version. Otherwise, the pricing team and the installation team may be working towards different arrangements.

Conditions to describe before selecting finishes

Add a short site note to the file. Useful entries concern cleaning, moisture, dust, temperature conditions and exposure near an outside loading area. Where a condition has not been established, identify who can supply the information. An industry name alone does not describe the specification.

“Food warehouse”, for example, leaves the cleaning method unspecified. “Chemical storage” leaves questions about substances and site classification. In a regulated environment, those answers belong with the appropriate local specialists; they cannot be derived from the business name.

Finishes can then be discussed against those requirements. Record the material or protection offered against the location where it will be used. A different installation’s photograph may illustrate an appearance, but it cannot fill in a missing specification on your quotation.

The quotation comparison sheet

Attach the enquiry revision to the comparison sheet when replies arrive. A low total is difficult to assess if the offer assumes different loading equipment or omits work another supplier included.

Item to compareRecord from each offer
Load and handlingCapacity, permitted loading arrangement and outstanding checks
SpaceUsable cabin size, clear entrances and layout revision
DutyTraffic assumptions and any limitations stated
SupplyIncluded equipment, documents and exclusions
Local workResponsibility for building interfaces, installation and destination requirements

Put unresolved differences into a clarification email before comparing the final totals. For costs outside the equipment supply itself, see the separate freight elevator cost guide.

What the photograph can tell you

The cover shows an actual elevator entrance from FEIYA’s park photo archive. That folder is classified as a 3-ton installation. It is included as an equipment reference, not as a warehouse case study.

You can see the entrance and its surrounding floor area. You cannot obtain an approved forklift loading arrangement, usable cabin dimensions or a handling rate from that view. Those belong in the project documents. Use your own load sheet and floor plans to describe what the new installation must do.

Send the file to FEIYA Elevator

You can begin through the FEIYA freight elevator page. For enquiries involving heavier loads, FEIYA’s confirmed capability includes 15-ton freight elevator solutions. The enquiry file is still needed to assess which configuration is suitable for the project. A larger nominal capacity does not answer the route and handling questions on your worksheet.

For the first enquiry, send the country, load sheet, handling method, floors served and the drawings available. Send the outstanding questions on the first page rather than hiding them among the drawings. Give the local installer and operations team a copy of the proposal while there is still time to resolve differences before ordering.

Start with the documents you have

The load sheet and a marked plan can begin a conversation with FEIYA Elevator. State the destination and floor count in the enquiry, and list the measurements you are still arranging. That makes the next questions clear to both sides.

Planning a warehouse freight elevator? Share your load, handling method, floors and destination.
独立站询盘
Discussion

Leave a Reply

Your email address will not be published. Required fields are marked *

From the archive

View all news & insights ↗