To import a freight elevator from China, prepare a brief that covers the load, building, destination and installation arrangement. Use it to obtain a project-specific quotation, then settle the drawing revisions, supply boundaries and shipping responsibilities before releasing the order. There is no single specification or document pack that suits every destination.
This is FEIYA Elevator's purchasing guide for importers and installation partners. It includes a report from our own archive and a suggested way to organise the order file. The planning examples are illustrative; they are not accounts of completed customer installations.
What goes into the first enquiry?
Four attachments make a useful starting packet. The names below are suggestions for organising the discussion, not prescribed industry forms.
- Project brief: destination, buyer, intended use, required stops and target dates. Include the name of the proposed installer, or state that the appointment is open.
- Load note: goods, packaging, handling equipment and the intended movement through the entrance. Explain which equipment and people would enter the car.
- Building information: available shaft drawings, floor heights, pit and overhead measurements, door positions and photographs of relevant access restrictions.
- Scope questions: equipment supply only or additional services, required documents, receiving arrangements and any conditions already raised by the local team.
The supplier can work through that packet without treating every missing item as an implicit instruction. A missing measurement remains a missing measurement. The buyer can still request an initial proposal, provided the assumptions and items awaiting confirmation are visible in the reply.
Give the prospective installer the same packet. Ask for a response against the layout and the proposed supply scope, including any documents needed for its local responsibilities. If the contractor has not accepted the work, record that status. Putting a company name into the enquiry does not establish that it has agreed to install, commission or maintain the elevator.
Keep a short contact list alongside the packet. Separate the person collecting answers from the people authorised to approve technical matters. For example, the buyer may coordinate a revised landing arrangement while the manufacturer, installer and building team review their respective interfaces. The coordinator needs their recorded decisions, not an assumption that silence means approval.
Separate an initial enquiry from a production instruction
An enquiry can begin with rough information. A production release cannot rely on the same uncertainty. In the brief, give each important dimension a status: measured on site, taken from a drawing, or awaiting confirmation. This helps the supplier recognise where a quotation is conditional.
For the load, describe the goods and everything intended to enter the car with them. Include packaging and handling equipment. State the proposed loading method and whether personnel are expected to travel. A forklift beside an elevator in a photograph does not establish that the truck may enter or travel in that elevator. Those questions need a configuration-specific review.
For the building, supply the shaft dimensions, pit and overhead information, floor heights, stops and door positions. Include obstructions and the route from the delivery area to the installation area. Photographs are useful attachments, particularly in an existing building, but dimensions should come from the relevant measured or approved information.
Suppose the building contractor proposes a narrower door opening after the first enquiry. Open a change entry containing the original drawing reference, the proposed revision and the reason for the change. Return it to the parties reviewing the equipment and building interfaces. Their response should identify whether the configuration, building work, price or schedule needs revision. This is a planning example, not a claim that a particular opening can be reduced safely.
Keep the earlier file in the archive and mark its status. Send the replacement through the agreed approval route. The production team and installer should be able to identify which version is current without comparing the dates of several informal messages.
Use the FEIYA freight elevator page to begin the product discussion. Keep the subsequent project layout separate from the website reference. The file you release for production should have its own identifier, revision and recorded approval.
Build one comparison sheet from the quotations
A comparison sheet needs more than a price column. For each requirement, enter the offered scope, any stated exclusion and the question still requiring an answer. Use the actual quotation reference so that a revised price cannot be mistaken for acceptance of a different layout. The following headings can be copied into a buyer's own worksheet.
| Line in the comparison | Entry to obtain from each offer |
|---|---|
| Elevator configuration | Model, rated load, speed, stops, entrances and agreed options |
| Drawing basis | Layout reference, revision and unresolved dimensions |
| Document delivery | Document list, language, responsible issuer and issue stage |
| Shipment boundary | Delivery term, named place and the work outside that boundary |
| Site work | Building preparation, installation and commissioning responsibilities |
| After handover | Warranty scope, maintenance contact and spare-parts arrangements |
Keep the price assumptions beside the scope. Our freight elevator cost article covers the configuration questions behind the equipment quotation. The import file needs a further line for expenses still being established by the forwarder, receiving team or local contractor. Record those as estimates or pending quotations until they are resolved.
Use a report number to ask a better question
Here is a real document example from FEIYA's internal archive. It is a supplemental type-test report, so the word “supplemental” belongs in the buyer's understanding of the record.
| Field in the archived record | What the copy records |
|---|---|
| Report identifier | TSX20230970 |
| Product model | THJ |
| Sample identifier | FYS2023-045 |
| Test period | August 1–14, 2023 |
| Report category | Supplemental type test |
| Conclusion | Pass within the report's stated scope |
A follow-up request could identify both TSX20230970 and FYS2023-045, then ask which companion material describes the offered configuration. That is more precise than asking for “the certificate” without naming a document. In this archive entry, one reference belongs to the report and the other to the tested sample; neither is the buyer's project number.
The copy includes technical-document review records and listed sample checks. It does not become evidence for every proposed car size or loading method just because the model family is relevant. For procurement, the next question is which supporting documents connect the offered configuration to the evidence, and whether the destination team considers that evidence appropriate for its process.
This example is not an independently authenticated certification claim, destination approval or a customer operating case. Nor does the photo on this article show that report's sample. Ask for missing companion documents where needed. Do not supply an absent technical value from a PDF file name or from an installation photograph.

Put the shipping handover into ordinary language
Use the agreed Incoterms rule, its named place or port and the edition in the contract. The ICC's Incoterms 2020 introduction explains their role in allocating delivery responsibilities, costs and risks. Have the proposed arrangement reviewed for the actual shipment rather than choosing an abbreviation because it appears on another quotation.
Then describe the practical handover. At the named point, which company takes responsibility for the next movement? Who arranges unloading where required? Who handles the applicable customs work? Who contacts the receiving team if the arrival appointment changes? The answer should identify the company doing the work, not only a person who will forward the message.
The commercial contract needs its own provisions for the equipment, payment, documents and other agreed terms. Incoterms are not a substitute for that contract. The forwarder, importing party and relevant advisers can identify issues for the route and destination; this article does not prescribe a universal customs classification or tax rate.
Take a receiving delay as another planning example. The equipment is ready, but the buyer's warehouse has no available space. A workable response needs the temporary storage location, the receiving contact, the revised appointment and agreement about additional costs and responsibilities. The supplier should advise on suitable protection and storage conditions. Resolve those points with the relevant parties before instructing dispatch; do not treat a new arrival date alone as the whole solution.
Give the receiving team a package-level plan
Ask for preliminary package dimensions and weights while transport and site handling are being planned. Label them preliminary. Before shipment, use the final package information to confirm the arrangements with the forwarder and qualified handling team. An overall elevator capacity says nothing useful about the weight of an individual packed component.
Package identification deserves attention when several elevators share a shipment. Ask how labels, packing-list entries and equipment references will distinguish the units. The receiving team needs to know where each package belongs without opening unrelated packages simply to find a reference.
For wooden packaging, check the material and destination requirements with the supplier and forwarder. IPPC's ISPM 15 concerns wood packaging material in international trade. Packaging compliance is a separate question from the elevator's technical documents. Obtain the relevant information for the shipment rather than treating a photograph of a crate as proof.
Reconcile the invoice, packing list and shipping details before dispatch. The buyer and importing party should recognise the company names, project references and quantities. Any documents required for clearance should be reviewed by the responsible importing party or broker while corrections remain possible.
Decide what a pre-dispatch review will actually cover
The phrase “inspection before shipment” needs a scope. A document review checks the file. A packing review checks agreed packaging information and identification. An equipment inspection has its own agreed checks. List the intended evidence and who reviews it before making inspection a payment or dispatch milestone.
Photographs can help document visible condition and package identification. They do not establish every technical function, local approval or installation requirement. If a particular check is needed, ask what procedure and record will address it. Do not wait for a folder of general factory photos and then argue about what it was meant to prove.
The schedule should also separate production readiness from operation at the building. Drawing approval, production release, transport, receiving access and installation each affect the plan. Ask what a quoted lead time starts from and what it ends with. A date for equipment readiness should not quietly become a promise that the building will have an operating elevator on that date.
Prepare a receiving record that the installer can use
A useful receiving record connects each package to the final packing list. Leave space for the package reference, visible condition, discrepancy description and the person making the record. Where photographs are used, label them so that the supplier can identify the package being discussed. This is a suggested administrative record; the handling and inspection procedures must suit the shipment and the responsible team.
Agree where discrepancies will be sent and who will respond. A photograph forwarded to a sales contact may start the discussion, but the receiver still needs a clear instruction about the affected item. Keep that exchange with the project file. If identification is uncertain, involve the supplier and installer before separating parts from labels or treating unfamiliar components as spares.
The receiving arrangement also needs a physical location. Review storage and access with the people handling the delivery before arrival. Final package information is the basis for their planning; a car's rated capacity is not an unloading instruction for its packed components.
For the installation handover, collect the current drawing register, relevant manuals and outstanding technical questions. Record who has reviewed site readiness within their responsibilities. If a difference between the drawing and the building is discovered, return it for technical review. Purchasing can coordinate the response without making an unapproved substitution.
Close the order with a service file
The owner needs to be able to identify the supplied equipment after the shipment reference has been forgotten. Keep the equipment identifiers with the final document list and service contacts. Ask the maintenance provider how it will access the information needed for its work and which unresolved documents it still expects.
For warranty and spare parts, record the agreed scope rather than relying on a general promise of support. The file should explain where an enquiry goes, what equipment details to provide and how the parties will handle the next step. A proposed spares package needs its own item list and explanation of suitability for this configuration.
Before signing off the purchasing administration, compare the delivered file with the contract's document list. Identify anything still owed, the responsible party and the agreed follow-up. Closing a commercial order should not erase an open technical-document request from the owner's records.
Send a brief with the unresolved items still visible
For a discussion with FEIYA, send the destination, load and handling information, required stops and available shaft drawings. Add the installation arrangement and any document requirements your local team has identified. Mark provisional dimensions and open scope questions instead of presenting them as settled facts.
Use the FEIYA project enquiry page to share that brief. In the enquiry, identify the decision you are trying to make next. You may need an initial configuration discussion, clarification of an equipment-only scope, or a response to a drawing revision. With that context, the proposal can address the actual purchase instead of leaving the supplier to guess which parts of the project are already settled.