Choose an elevator manufacturer in China by reviewing the proposed order: the company that will supply it, the configuration it has offered, the evidence supporting that configuration and the work each party will perform. A supplier visit becomes much more useful when those four subjects are already on the agenda. The ten checks below turn them into questions for your purchasing and technical teams.
FEIYA Elevator publishes this guide for overseas buyers preparing a supplier meeting. It is our perspective as a manufacturer, not an independent ranking. Apply the questions to a FEIYA proposal as you would to another candidate. They are intended for the stage after you have a shortlist, when a conversation needs to move from general product information to the order itself.
Before the meeting: define the order you are reviewing
1. Identify the contracting party and the manufacturer
Have the quotation and technical documents open together. Find the company name in each, then check the roles. If one entity sells the equipment and another manufactures it, request an explanation that can be retained with the contract file. A trading arrangement may be perfectly workable, but the buyer needs to understand it.
The same applies to contacts. Who can agree a price change? Who answers a drawing question? Who is authorised to approve a technical substitution? A list of names and responsibilities is more useful here than several business cards without an agreed route for decisions.
Use our FEIYA company profile for public background, then obtain the records relevant to your proposal. Similar English names should not be treated as proof that two documents refer to the same entity. Payment instructions also deserve a separate check through the buyer's established purchasing procedure.
2. Mark the assumptions in the project brief
A brief should tell the supplier what the elevator is expected to move and how it will be used. For a freight installation, include the goods, proposed capacity, loading method, handling equipment, stops, travel and available shaft information. Beside each provisional dimension, state where it came from.
“Five-tonne lift for pallets” is an illustrative enquiry, not a complete specification. It does not say whether a handling truck enters the car, whether the weight includes that truck or whether anyone accompanies the load. Those questions need answers before suitability can be assessed. The capacity number alone does not establish forklift access, allowable wheel loads or permission for an attendant.
Send the brief before the meeting and retain that dated version. When a candidate comes back with questions, add the answers to the shared record. This prevents a useful early conversation from becoming a set of assumptions that neither side remembers agreeing.
3. Prepare one report-to-offer comparison
There is a useful example in FEIYA's archive. The supplied copy of report TSX20250651 identifies model THJ15000/0.5-JXVF and sample H25-042. It records tests dated August 11–14, 2025. The parameter page lists 15,000 kg, 0.50 m/s and 12:1 suspension, with the machine and controller in a machine room.
Suppose a buyer is considering a machine-room-less arrangement. That is a hypothetical comparison, not a description of this tested sample. Matching the load rating would still leave the arrangement different. The useful meeting question is: which documents support the offered configuration, and how is their applicability established? Simply attaching the report to the quotation would leave that question open.
This article has not independently authenticated the archived copy. The example is limited to its identified sample and recorded fields. It is not evidence of destination-country acceptance, a different capacity or a customer's operating history. Request the applicable complete documents and agree how the project team will verify them. Keep any unresolved applicability question visible before accepting the technical proposal.
During the review: follow the work and its records
4. Follow a job reference through the factory
Choose an order the supplier is permitted to discuss, with customer details concealed where necessary. Start at a drawing revision. How does that revision reach the production team? Where is the order reference carried into the relevant assembly or inspection record? What identifies the finished equipment for dispatch?
You are looking for a connection between records, not collecting a photograph of every workshop area. If the order shown is unfinished, note what stage it has reached and which checks remain. A work in progress should stay a work in progress in your notes.
A remote review can follow the same outline. Agree the records and areas to be shown beforehand, and distinguish a live walkthrough from a prerecorded presentation. Neither automatically becomes an independent factory audit. If an independent audit is needed, define that assignment separately rather than giving a supplier call a stronger label afterwards.

5. Test the component-change procedure
Select a component from the proposed specification and ask how its identity will be recorded. Then introduce a hypothetical problem: the quoted item is unavailable before assembly is complete. Who proposes a substitute, and what must happen before it can be used?
The response should let your technical reviewer identify the replacement and assess the information supplied with it. “Equivalent” is not a component description. Record the reason for the proposed change, any effect on the agreed specification and the approval route. Where the change affects other documents, ask how those revisions will be issued.
This discussion is worth having while there is still time to agree a process. It is harder to reconstruct a decision after delivery, particularly if purchasing, engineering and maintenance use different document versions. The point is not to reject every substitution; it is to know what was proposed, reviewed and accepted.
6. Establish what a project reference actually covers
A photograph can show an elevator entrance. It cannot, on its own, explain the supplier's contractual role, the acceptance status or what happened after handover. When a manufacturer presents a reference, ask which part of the project it supplied and what relevant information it is authorised to share.
Our published 12-tonne freight elevator project page is a reference for a discussion about that project. It is separate from the sample test report described earlier. Neither should be used to fill gaps in the other.
If confidentiality limits the material available, record the limitation and the follow-up question. Avoid assuming that every missing detail confirms or discredits the claim. Keep illustrative material separate from the records used for a decision. A photograph of people reviewing drawings shows the activity. The audit record, drawing approval and report identifiers establish what was actually reviewed.
Before committing: close the drawing and delivery interfaces
7. Decide who approves each drawing revision
Review the proposed layout with the people responsible for the building and installation. They need an identifiable drawing revision, a record of assumptions and a route for resolving discrepancies. “Latest drawing” in an email subject is a poor substitute for a revision reference both parties can retrieve.
An existing building offers a simple example. An opening width may have come from an old plan rather than a current measurement. Identify the source, assign someone to confirm it and keep the value provisional until that happens. Accepting a quotation should not quietly turn an estimate into a construction instruction.
Agree what happens if the site information changes after approval. Drawings, price and delivery may need review. Our freight elevator product page introduces the product scope, while the project documents must address the actual shaft, loading method and agreed configuration.
8. Read the supply scope with the local installer
Start at the point where the shipment arrives. Who receives it, checks its contents and provides storage? Continue through installation, commissioning and coordination of the applicable local approvals. The responsibilities depend on the contract and destination, so ask for a written allocation for this order.
The word “support” deserves particular attention. Remote assistance needs an agreed contact route, language and availability. A site visit needs a defined purpose and scope, including how travel, accommodation or further visits are treated. Neither should be assumed to include all installation work.
Let the intended installer identify missing drawings and work it has not priced. That discussion may uncover a gap before the order is placed. Record the answer in the scope comparison, where purchasing can see it, rather than leaving it in a separate technical email chain.
9. Review the handover information with maintenance
Obtain a proposed document list and delivery timing. Depending on the agreed scope, this may include drawings, manuals, identification records, packing information and relevant test records. Confirm the receiving team's language and format needs while the supplier can still plan the handover.
For spare parts, try a specific question: what information should the maintainer send to identify the replacement it needs? Discuss availability for the actual components and the process for reviewing alternatives. A general promise of spare-parts support is not much help without a usable identification method.
Warranty scope belongs in the commercial documents. Check the proposed start event and exclusions, together with the treatment of labour, freight and travel. The maintenance team may spot an assumption that purchasing missed, particularly where a separate local company will service the equipment.
10. Give every open point an owner and a decision date
Before ending the review, collect the unanswered questions in one short record. Do not convert a professional-looking visit into an invented score. The record should show what evidence is missing and which next action depends on it.
| Open point | Response to retain | Decision affected |
|---|---|---|
| Provisional site dimension | Dated measurement or confirmed drawing | Layout approval |
| Report applicability | Identified evidence and technical explanation | Acceptance of the proposed configuration |
| Component substitution | Description and approval procedure | Specification agreement |
| Installation responsibility | Written division of work | Scope and cost comparison |
Some items can remain open during initial comparison. Others must be settled before drawing approval or production release. Record that distinction, the person responsible and the agreed response date. An unanswered question should not disappear simply because the rest of the order has progressed.