A freight elevator needs enough rated load for what will travel inside it and enough usable space for that load to enter, stand and leave. Neither check replaces the other. A light, bulky crate can exceed the available space long before it reaches the weight limit. A compact machine can fit comfortably while placing a demanding load on a small part of the floor.
For a purchasing team, the useful starting point is a load schedule and a layout drawing, reviewed together. This guide from FEIYA Elevator explains how to prepare them, what historical product data can tell you, and which questions need a project-specific answer before an order is approved.
Start with the complete travelling load
The product weight on a packing list may not be the weight presented to the elevator. Add the packaging, pallet, stillage or trolley that accompanies it. Describe any handling equipment entering the car, including equipment that crosses the entrance only during loading. If people are intended to travel with the goods, state that requirement so the proposed elevator type and permitted use can be checked.
Record the heaviest planned trip separately from the most common trip. A routine delivery of cartons and an occasional machine replacement can have very different requirements. Naming both avoids buying around the daily average and discovering later that the exceptional load cannot be accommodated.
For each item, identify where the weight came from: a measured value, a supplier's shipping document or an estimate. Do the same for dimensions. An estimate is useful during an early enquiry when it is labelled as such; it should not silently become the approved loading condition. The freight elevator capacity guide covers the broader choice of load rating. Here, the next step is to connect that rating to the actual load shape.
Measure the packed envelope, not just the product
Use the outermost length, width and height of the load in its travelling condition. Include straps, protective corners, projecting feet and any packaging overhang. A machine's catalogue dimensions may exclude the transport base or the crate supplied by the exporter. Check the orientation as well: a load that can lie horizontally in storage may have to remain upright in transit.
Put the envelope on a simple plan drawing. Show the entry direction, the intended position in the car and the way it will leave at the destination. For a trolley, include handles and the space required to manoeuvre it. If the load cannot turn, show that constraint explicitly instead of assuming it will rotate once inside.
This is also the stage to identify fixtures that reduce usable space, such as protective rails or other agreed interior fittings. Ask whether quoted cabin dimensions refer to the finished clear interior. An outer car dimension, a shaft dimension and a usable internal dimension describe different things. The shaft and cabin planning guide explains those drawing labels in more detail.
Same rated load does not mean the same cabin
FEIYA's archived freight elevator parameter sheet includes the following two entries. They illustrate why a capacity label alone is not enough to establish a layout.
| Historical entry | Rated load | Car inner width and depth | Clear door width and height |
|---|---|---|---|
| Archived row seven | Three thousand kilograms | 2130 脳 2670 mm | 1800 脳 2100 mm |
| Archived row eight | Three thousand kilograms | 2130 脳 2570 mm | 1800 脳 2100 mm |
Source: FEIYA archived parameter sheet FY-SRC-005, rows seven and eight. These are historical reference figures, not current standard configurations or minimum building dimensions. Final specifications depend on the customer's requirements, actual hoistway and building conditions, and approved project drawings. The archive does not explain the construction differences between these two entries.
The listed capacity is the same, but the internal depth differs by 100 mm. That difference may matter to a particular packing arrangement; it does not establish a universal operating clearance. A buyer must still test the complete layout against the proposed drawing. Do not combine a cabin dimension from one archived row with a shaft or door dimension from another to create a configuration that the source never described.
A real project reference also needs the right level of detail. One FEIYA project note records a three-tonne goods elevator serving eight floors at a new-materials development in Jinhua. That record supports the stated load and service context. It does not supply the cabin dimensions, wheel loads or loading arrangement. It therefore cannot establish that another buyer's three-tonne load will fit. The project note and the historical table are separate records.
Compare weight and space on one review sheet
A useful comparison sheet gives the purchasing team and technical reviewer the same questions. It does not need to be a complicated calculation workbook.
| Review item | Information to provide | Question to resolve |
|---|---|---|
| Total travelling weight | Goods, packaging, carriers and other intended occupants or equipment | What rated load and permitted operating arrangement does the supplier propose? |
| Packed envelope | Maximum outside dimensions and orientation restrictions | Does the complete load fit within the finished usable interior? |
| Entry and exit | Door opening, approach direction and destination layout | Can the load pass through and leave without an unplanned turn? |
| Support and contact | Skids, feet, wheels and their locations | What local floor and threshold checks are needed? |
| Repeated trips | Typical batch and expected loading sequence | Is the proposed arrangement practical for normal operations? |
Keep unresolved items visible. For example, mark a trolley weight as awaiting confirmation rather than replacing it with a convenient round number. Where two suppliers propose different layouts, compare the same load drawing against each. Otherwise one offer may look more generous simply because it was based on a smaller package or a different unloading method.

A load that fits can still require a different floor assessment
Space and total weight are only part of the review. Tell the supplier how the load is supported: distributed across a pallet, resting on narrow skids, standing on feet or carried by wheels. Share available contact dimensions and wheel or axle information. These details help the technical team identify the checks needed for the car floor, entrance and loading arrangement.
Do not treat the rated capacity as a published allowance for every possible wheel load. Equally, dividing a total weight by the whole cabin floor area does not describe a machine supported at a few small points. The supplier needs the actual contact arrangement and the intended movement across the entrance.
Forklift use deserves a separate, explicit discussion. State whether the truck remains outside, partly enters during transfer or travels inside with the goods. Provide the relevant truck and load information for that method. A large-looking cabin or a heavy load rating is not evidence of forklift suitability. The forklift loading guide sets out the information to discuss before choosing that arrangement.
Check the route beyond the car
Trace the load from its waiting position to the elevator, into the car and out to its destination. A workable cabin layout can still be defeated by a narrow approach, an awkward corner or a destination with no room to withdraw the trolley. Record the restrictive location rather than supplying only the widest corridor dimension.
For an existing building, distinguish measured conditions from drawing assumptions. Note obstacles and any planned building alterations. A photograph helps explain the location, but it is not a substitute for measured clearances. Where the installation team needs a site survey, allow that step before treating a preliminary proposal as a construction arrangement.
Also discuss where loading and unloading will happen. Same-side access and through access create different movement patterns. Neither should be assumed from the number of floors served. Mark the proposed openings on the drawings and agree how the load reaches each one. This keeps a purchasing discussion about cabin size connected to how the building will actually be used.
Resolve the trade-off before requesting a larger rating
When a load does not fit, first identify the failing condition. Is it too heavy, too long, too tall, unable to turn, or difficult to position? Increasing the rated load is not a complete answer to an unchanged door opening or an unsuitable approach. A revised car layout may also affect the building interface and needs its own review.
Possible discussions include changing the packaging, dividing a shipment into genuinely separable items, using a different carrier, changing the transfer method or revising the proposed elevator arrangement. These are options to assess with the relevant teams, not instructions to alter goods or handling procedures without approval.
Record the chosen arrangement in the enquiry and carry it into the order drawings. Include the load schedule revision, interior dimensions, entrance details and any loading restrictions agreed during technical review. If the packaging or handling equipment changes later, reopen the affected checks. Approval of one load arrangement does not automatically cover the replacement.
Questions buyers often ask
Can I select a freight elevator from cubic volume alone?
No. Equal volumes can have different shapes, weights and support arrangements. A long package and a stack of small cartons may occupy similar volume but need different doors and movement space. Use the actual packed envelope and weight, then check the entry and placement sequence.
Should I add a standard percentage to the load weight?
Do not use an unexplained percentage as the whole selection method. First establish the complete load, uncertainties and foreseeable changes in use. Ask the supplier to explain the proposed rating and its assumptions for that brief. Extra nominal capacity does not resolve missing geometry or contact information.
Does a photograph show whether my load will fit?
It can show the general arrangement and help frame questions, but perspective is not a reliable dimension. This article's cover is an application concept based on a real three-tonne FEIYA entrance photograph. It is not a dimensional drawing or evidence for the archived configurations in the table.
Prepare a usable enquiry for FEIYA Elevator
Send the complete load schedule, packed dimensions, loading method and available site drawings when discussing a FEIYA freight elevator proposal. Highlight the load that is heaviest and the one that is hardest to manoeuvre; they may be different items. Include the project location and the parties responsible for building and installation coordination. Contact FEIYA Elevator with those materials so the proposed capacity and usable space can be reviewed together.